CNN

NASA rolls mega Artemis I moon rocket out to the launchpad

Mar 18, 2022, 12:54 PM

Artemis I...

In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Photo credits: NASA/Glenn Benson

(SLS)

Originally Published: 17 MAR 22 09:33 ET
Updated: 18 MAR 22 13:22 ET

(CNN) — The Artemis I mission is another step closer to its lunar launch.

The massive 322-foot-tall (98 meters) stack, which includes NASA’s Space Launch System rocket topped by the Orion spacecraft, rolled out for its testing debut at Kennedy Space Center in Florida on Thursday.

Related: BYU researchers introduce drought-resistant quinoa as nations face food challenges

The integrated stack, which sits on a mobile launcher, began its slow-moving crawl into launch position Thursday afternoon. The rollout officially began at 5:47 p.m. ET.

The 4-mile (6.4-kilometer) ride aboard one of the Apollo-era giant NASA crawlers from the assembly building to the launchpad took almost 11 hours. The stack arrived at the pad at 4:15 a.m. ET on Friday.

As the stack emerged on Thursday, it became the first moon-bound rocket to leave the building since Apollo 17 in 1972, or 50 years ago — also the last time anyone set foot on the moon.

“Every single vehicle that has carried humans beyond the bounds of low-Earth orbit has undergone integration and testing in that Vehicle Assembly Building, crawled down this roadway and launched right here from the Kennedy Space Center,” said Janet Petro, director for Kennedy Space Center, as the rollout began on Thursday.

Together, the rocket and spacecraft stand just taller than the Statue of Liberty.

“Rolling out of the (Vehicle Assembly Building) is really an iconic moment for this vehicle,” said Tom Whitmeyer, associate administrator for exploration systems development at NASA Headquarters during a Monday press conference. “Thursday is going to be a day to remember.”

A final test
Following a couple weeks of tests at the pad, the vehicle will be ready for its wet dress rehearsal the weekend of April 1 — the final test before launching the first uncrewed Artemis mission beyond the moon and back to Earth. NASA is collecting names to be put on a flash drive and sent into space on the Orion spacecraft.

The wet dress rehearsal includes running through the full set of operations to load propellant into the fuel tanks and a launch countdown — basically everything necessary for a launch without actually launching. During the hours of prep leading up to the wet dress rehearsal, more than 700,000 gallons of cryogenic propellants will be loaded into the rocket

If the test is successful, the stack will go back into the assembly building until it’s ready to launch.

“Artemis I is such an important mission for us,” said Howard Hu, manager of the Orion program at NASA’s Johnson Space Center in Houston, during the Monday press conference. “It’s gathering very critical engineering data and validating our performance capability as spacecraft for our next mission and beyond — Artemis 2 with the crew and future missions as we go further and expand our capabilities in the solar system.”

The Artemis program has experienced a multitude of delays. The mission was originally scheduled to launch in November 2021, but the pandemic, storms like Hurricane Ida and other factors have drawn out the mission time line.

Artemis I is the first step of NASA’s ambitious program to land the first woman and the first person of color on the moon later in the 2020s. It’s all in preparation to establish a long-term lunar presence and to prepare for exploring Mars. Depending on the results of the wet dress rehearsal, the uncrewed mission could launch in May, June or July.

During the flight, the uncrewed Orion spacecraft will launch atop the SLS rocket to reach the moon and travel thousands of miles beyond it — farther than any spacecraft intended to carry humans has ever traveled. This mission is expected to last for a few weeks and will end with Orion splashing down in the Pacific Ocean.

Artemis I will be the final proving ground for Orion before the spacecraft carries astronauts to the moon, 1,000 times farther from Earth than where the space station is located, said Cathy Koerner, former Orion program manager, in October. Koerner is now NASA’s deputy associate administrator for exploration systems development.

After the uncrewed Artemis I flight, Artemis II will be a crewed flyby of the moon and Artemis III will return astronauts to the lunar surface. The time line for the subsequent mission launches depends on the results of the Artemis I mission.

“There’s no doubt that we are in a golden era of human space exploration, discovery and ingenuity in space, and it all begins with Artemis, I,” said NASA Administrator Bill Nelson during the rollout.

“The Space Launch System is the only rocket capable of sending humans into deep space. It’s the most powerful rocket in the world. Orion will venture farther than any spacecraft built for humans. And after a three-week journey of over a million miles, Orion will come home faster and hotter than any vehicle has before.”

NASA astronaut Victor Glover Jr. was also at the rollout and reflected on the importance of the Artemis program.

“This is our rocket, it’s humanity’s rocket,” Glover said. “When those four RS-25 (engines) and two solid (rocket boosters) light, I hope the whole world is watching. And I hope a lot of kids decide to study science and math because of it. And that’s really what it’s about, inspiring kids to go out and be their best selves.”

An iconic crawl
Artemis I rode on top of Crawler-transporter 2 for its trip to the launchpad, just like the shuttle missions and Apollo Saturn V rockets once did.

The 6.6 million-pound (3 million-kilogram) crawler carried the towering rocket stack and its mobile launcher at a top speed of 1 mile per hour (1.6 kilometers per hour).

The iconic crawler is one of two that have operated for more than 50 years at Kennedy Space Center. They were first operated in 1965 and can each transport 18 million pounds (8.2 million kilograms), or the weight of more than 20 fully loaded 777 airplanes, according to NASA. They are so wide that a professional baseball diamond could sit on top of each crawler.

“It’s gonna be amazing,” said Charlie Blackwell-Thompson, Artemis launch director for NASA’s Exploration Ground Systems program at Kennedy Space Center on Monday. “She has been in operation for 50 plus years and underwent significant upgrades as part of getting ready for this vehicle and for Artemis operations.”

After upgrades, Crawler-transporter 2 should be able to keep hauling massive rockets to the launch pad for years to come.

The-CNN-Wire
™ & © 2022 Cable News Network, Inc., a WarnerMedia Company. All rights reserved.

25 DESARROLLOS TECNOLÓGICOS REVOLUCIONARIOS DE ES

We want to hear from you.

Have a story idea or tip? Send it to the KSL NewsRadio team here.

CNN

"Purple Rain" House - AirBnb Icons...

Lisa Respers France, CNN

Airbnb’s Icons allow you to drift off in the ‘Up’ house or rest in Prince’s ‘Purple Rain’ mansion

If you have ever wanted to dream in the balloon-lifted “Up” house, party with Kevin Hart or jam with Doja Cat, Airbnb has just the thing.

2 days ago

A destroyed building in Ocheretyne village on the Adiivka frontline in eastern Ukraine last month....

Andrew Carey and Olga Voitovych, CNN

Russia makes tactical gains in eastern Ukraine, concerns raised over Ukrainian military reporting

Forces from Russia have made further gains in at least three locations along the eastern front in Ukraine.

5 days ago

In this photo provided by David Yellowhorse, a freight train carrying fuel derailed and caught fire...

Rebekah Riess and Paradise Afshar, CNN

Evacuations lifted after dozens of train cars derailed near New Mexico state line, some carrying propane

Thirty-five rail cars of a train derailed in New Mexico Friday afternoon, prompting evacuations that lasted until Sunday.

5 days ago

A man in Rafah, Gaza, writes a message of thanks to student protesters in the US on Saturday, April...

Tareq Alhelou, Kareem Khadder, Abeer Salman and Zeena Saifi, CNN

Students and children in Gaza thank pro-Palestinian protesters at US college campuses

Originally Published: 28 APR 24 13:18 ET Updated: 28 APR 24 15:05 ET Rafah (CNN) — Dozens of Palestinian students and children staged a display of solidarity at a demonstration in southern Gaza on Sunday to express gratitude for the support seen on US college campuses in recent weeks. Related: Utah Sen. Mike Lee rallying […]

5 days ago

Gun reform activists protest SB 1325 in Nashville, Tennessee, on April 23....

Jamiel Lynch, CNN

Tennessee lawmakers pass bill allowing teachers, school staff to be armed

State legislators in Tennessee passed a bill Tuesday allowing teachers and school staff to carry a gun on school grounds.

7 days ago

At the London premiere for her new movie "Challengers" on April 10, Zendaya was center stage (if no...

Leah Asmelash and Alex Rees, CNN

All the times Zendaya served looks on the ‘Challengers’ press tour

Originally Published: 11 APR 24 11:33 ET Updated: 26 APR 24 17:22 ET (CNN) — Zendaya has always aced the red carpet. But her latest press tour is, well, a grand slam. In recent weeks, the actor has been promoting her new movie “Challengers,” in which she plays a tennis star-turned-coach who must navigate her […]

7 days ago

Sponsored Articles

a doctor putting her hand on the chest of her patient...

Intermountain Health

Intermountain nurse-midwives launch new gynecology access clinic

An access clinic launched by Intermountain nurse-midwives provides women with comprehensive gynecology care.

Young couple hugging while a realtor in a suit hands them keys in a new home...

Utah Association of Realtors

Buying a home this spring? Avoid these 5 costly pitfalls

By avoiding these pitfalls when buying a home this spring, you can ensure your investment will be long-lasting and secure.

a person dressed up as a nordic viking in a dragon boat resembling the bear lake monster...

Bear Lake Convention and Visitors Bureau

The Legend of the Bear Lake Monster

The Bear Lake monster has captivated people in the region for centuries, with tales that range from the believable to the bizarre.

...

Live Nation Concerts

All the artists coming to Utah First Credit Union Amphitheatre (formerly USANA Amp) this summer

Summer concerts are more than just entertainment; they’re a celebration of life, love, and connection.

Mother and cute toddler child in a little fancy wooden cottage, reading a book, drinking tea and en...

Visit Bear Lake

How to find the best winter lodging in Bear Lake, Utah

Winter lodging in Bear Lake can be more limited than in the summer, but with some careful planning you can easily book your next winter trip.

Happy family in winter clothing at the ski resort, winter time, watching at mountains in front of t...

Visit Bear Lake

Ski more for less: Affordable ski resorts near Bear Lake, Utah

Plan your perfect ski getaway in Bear Lake this winter, with pristine slopes, affordable tickets, and breathtaking scenery.

NASA rolls mega Artemis I moon rocket out to the launchpad